Whites Creek Quarry

2855 WHITES CREEK PIKE

RGI owns nearly 400 acres at the Whites Creek location. However, over the past 25 years, active operations have been limited to an approximately 74-acre footprint, consisting of a quarry and asphalt plant.  

The Process

1. EXTRACTION
Controlled blasting is used to fracture limestone into large, loose pieces of rock that can be transported with equipment.

2. CRUSHING
Trucks carry the larger pieces of rock to machines that crush them until the material meets the required size specifications for the products that are offered at Whites Creek Quarry.

3. SORTING AND SCREENING
A series of connected conveyers and screening filters separate larger pieces from the smaller pieces before sorting all of the material into designated areas based on size and product type.

4. STOCKPILING AND QUALITY CONTROL
We test samples to make sure the material meets requirements for things like size, cleanliness, and durability. For example, material intended for highway construction may need to meet specific state transportation standards.

5. WEIGHING
A dump truck enters the facility, gets loaded with the material that is requested by that customer. Before exiting, the truck drives by the “scale house” over a large vehicle scale where our team records how many tons of product is being sold.

6. TRANSPORTATION AND DELIVERY
The material leaves the facility and is delivered to a construction site, asphalt plant, or other customer.

Why Do We Need Rock Quarries?

An average-sized home requires 100 tons of crushed stone.

An average-sized home requires 100 tons of crushed stone.

An average-sized home requires 100 tons of crushed stone.

An average-sized home requires 100 tons of crushed stone.

Timeline

▶1932
Menefee Crushed Stone first establishes a quarrying operation at this location

▶Pre-1953
Davidson County, TN local government establishes a quarrying operation directly adjacent to Menefee Crushed Stone

▶1972
The earliest documented MSHA (Mine Safety & Health Administration) reports for the site

Mining operations change ownership multiple times over the decades

▶2004
Rogers Group purchases the facility from the previous operator

▶2022
Rogers Group purchases additional acreage adjacent to the existing site from Nashville Area Habitat for Humanity

DID YOU KNOW?

The largest cost associated with supplying aggregate for construction projects is transportation of the material. Having rock quarries nearby helps to save money for taxpayers by lowering the costs of building and repairing local roads.

DID YOU KNOW?

Aggregate mines use water to mitigate dust during the mining process. Water trucks are continuously spraying water across the operation. Water is recycled and Whites Creek Quarry is almost entirely self-sufficient in its water usage.

Site & Project Background

About Rogers Group

Founded in 1908, Rogers Group, Inc. (RGI) remains a family-owned company and has grown to become the largest privately held producer of construction aggregates in the United States. RGI is headquartered in Nashville’s Metro Center and works across the Midwest and Southeast.

About Whites Creek Quarry

Whites Creek Quarry is one of RGI’s 35 limestone quarries in Tennessee and one of only two in Nashville. The site has operated as a quarry for nearly 100 years and was purchased by Rogers Group in 2004. RGI owns nearly 400 acres at the location, with active operations historically limited to an approximately 74-acre footprint.

Location

While not situated directly within the Whites Creek community, Whites Creek Quarry is located in North Nashville near the intersection of Whites Creek Pike and Knight Road.

Looking Ahead

RGI is planning additional phases of development at the site, with a focus on supporting operational needs while prioritizing the interests of the surrounding community. The plan includes continued underground mining and a community hub designed by neighbors on 240 acres of land across from the quarry site.

Approval from Metro Nashville Planning Commission is required in order to move forward with plans for the 240+ acres of nature preserve, park and community gathering area, and the designated commercial property.

Metro Planning wants to hear from the community before they consider this proposal. Please share your support for the park by sending a message to staff below.